The tile job is going slow.
Here is the bathroom. First room done.
The blue tape dots are the tiles that are dry.
We can walk on these (Note: There is no toilet.)
He worked really hard to take the tile from the front entry.
We wanted it all uniform.
Since I've been sick,
Sweetheart is balancing
work, boys, me, and the home improvement.
We've such a long way to go.
My job is to get better.
His job is overwhelming.
No comments:
Post a Comment